Offshore-Windpark Borkum

Loading of transition Pieces and Monopiles

For the Offshore-Windpark Borkum Riffgrund 1- Loading, transport and storage off Transition Pieces (TP's) and Monopiles (MP's) in Eemshaven.

77 MPs each with individual weight of 350 tons and the 77 MPs to 700 tons had to be moved with special equipment -a challenge for logistics. For this, a modified 600 ton crawler crane type Liebherr LR 1600/2 was used. TPs were transported over a distance of 400 meters over a sand bed and the crane mats supplied by us . The MPs were immediately placed on a ship from the SPMT (Self Propelled Modular Transporter).


next news item Return to the overview

Related news

Curious where the bog mats of Welex are currently forming the foundation? You can read more on the news page.

Welex forms the foundation for many different projects. From large events to the construction of pipelines. Wondering where our latest projects took place? You can read more on our news page.